Doing hard time in Leros (Leros)

25th June 2019 (Leros) Another ‘on the hard’ installment I’m afraid.. We’re now into our 7th week out of the water. We moved back into the boat last week, unable to justify the expense of staying at ‘Maison de Coleurs’ any longer. The current hold up stalling our repair is the ‘dampness’ of the GRP (fibreglass) in the bilge drain. Until that is sufficiently dry, the repair cannot proceed. We have all the windows shut and two dehumidifiers are running 24/7 in the cabin. This makes going below into the main cabin close to unbearable with the outside temps nudging close to 30. The yard itself is dusty and airless, the surrounds have a baked scrubby feel reminiscent of a scene from The Good the Bad and the Ugly. Days are pretty lazy, there’s boat jobs that we’re chipping away at, but time is a commodity which we have an excess of, so not much urgency for anything. Highlights of the day are: Bugle call to wake up the local barracks at around 7:30, a bakers v...